{"id":15768401,"date":"2020-07-06T15:05:14","date_gmt":"2020-07-06T15:05:14","guid":{"rendered":"https:\/\/adf-systemes.fr\/the-ppms-for-isaac-de-letoile-ensuring-the-protection-of-people-on-a-large-scale-school-site\/"},"modified":"2026-01-15T14:49:29","modified_gmt":"2026-01-15T14:49:29","slug":"the-ppms-for-isaac-de-letoile-ensuring-the-protection-of-people-on-a-large-scale-school-site","status":"publish","type":"post","link":"https:\/\/adf-systemes.fr\/en\/the-ppms-for-isaac-de-letoile-ensuring-the-protection-of-people-on-a-large-scale-school-site\/","title":{"rendered":"The PPMS for Isaac de l&#8217;\u00e9toile: Ensuring the protection of people on a large-scale school site."},"content":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; _builder_version=&#8221;4.16&#8243; global_colors_info=&#8221;{}&#8221; theme_builder_area=&#8221;post_content&#8221;][et_pb_row _builder_version=&#8221;4.16&#8243; custom_padding=&#8221;14px|||||&#8221; global_colors_info=&#8221;{}&#8221; theme_builder_area=&#8221;post_content&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;4.16&#8243; global_colors_info=&#8221;{}&#8221; theme_builder_area=&#8221;post_content&#8221;][et_pb_text _builder_version=&#8221;4.24.0&#8243; custom_margin=&#8221;||50px|||&#8221; hover_enabled=&#8221;0&#8243; global_colors_info=&#8221;{}&#8221; theme_builder_area=&#8221;post_content&#8221; sticky_enabled=&#8221;0&#8243;]<\/p>\n<p><em>The Isaac de l&#8217;Etoile school complex, spread over more than 14 hectares, called on ADF Syst\u00e8mes to install a population alert system meeting new safety standards (vigipirate, natural and technological risks) as part of its <strong>PPMS<\/strong> (Plan Particulier de Mise en S\u00e9curit\u00e9).<\/em><\/p>\n<p>Isaac de l&#8217;\u00e9toile, located in Poitiers&#8217; northern industrial zone, is an XXL school complex grouping together several Catholic educational establishments in the area. Covering an area of <strong>over 14 hectares<\/strong>, Isaac de l&#8217;\u00e9toile was created by merging several of Poitiers&#8217; high schools and middle schools, which no longer met public reception standards. <\/p>\n<p>From Coll\u00e8ge St-Stanislas to Lyc\u00e9e du Porteau, Catholic education decided in 2008 to combine all its establishments into a modern structure promoting education.<\/p>\n<p>Cut through by a central road, the school complex comprises 11 buildings and caters for students from secondary school to BAC+2.<\/p>\n<p>In total, nearly <strong>2,000 students, 225 teachers and 100<\/strong> administrative and technical <strong>staff<\/strong> work here every day. In ten years, the number of students has increased by over 40%! <\/p>\n<p>Joseph Weibel, deputy director in charge of the school&#8217;s general resources, who was behind the introduction of the <strong>PPMS<\/strong>, explains that it took almost three years of work to bring it all together.<\/p>\n<p>Following renovation work, the purchase of new land and the extension of the group, the school was able to welcome students in excellent working conditions.<\/p>\n<p>[\/et_pb_text][et_pb_image src=&#8221;https:\/\/adf-systemes.fr\/wp-content\/uploads\/2020\/07\/Capture-d\u2019e\u0301cran-2020-07-06-a\u0300-16.55.42.png&#8221; align=&#8221;center&#8221; _builder_version=&#8221;4.24.0&#8243; hover_enabled=&#8221;0&#8243; global_colors_info=&#8221;{}&#8221; theme_builder_area=&#8221;post_content&#8221; sticky_enabled=&#8221;0&#8243;][\/et_pb_image][et_pb_text _builder_version=&#8221;4.24.0&#8243; hover_enabled=&#8221;0&#8243; global_colors_info=&#8221;{}&#8221; theme_builder_area=&#8221;post_content&#8221; sticky_enabled=&#8221;0&#8243;]<\/p>\n<h2><strong>2016 : Reinforcing school safety standards<\/strong><\/h2>\n<p><span style=\"font-weight: 400;\">In the wake of the attacks that hit France in 2015 and 2016, three ministerial circulars reinforced the security of schools. New regulations were introduced in response to the <\/span><a href=\"https:\/\/www.education.gouv.fr\/consignes-de-securite-applicables-dans-les-etablissements-relevant-du-ministere-de-l-education-9950\"><span style=\"font-weight: 400;\">Vigipirate plan<\/span><\/a><span style=\"font-weight: 400;\"> &#8220;Reinforced security &#8211; risk of attack&#8221;. <\/span> <\/p>\n<p><span style=\"font-weight: 400;\">These circulars distinguish natural and technological hazards from terrorist threats and armed intrusion. To this end, an <\/span><b>an appropriate &#8220;attack-intrusion&#8221; warning system<\/b><span style=\"font-weight: 400;\"> must be installed in every school building. A Special Security Plan<strong>(PPMS<\/strong>) must be drawn up.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Given Isaac de l&#8217;\u00e9toile&#8217;s geographical location, close to an industrial zone and SEVESO plants, the risk of terrorist attacks is added to the natural and technological risks in the area.  <\/span><span style=\"font-weight: 400;\"><br \/><\/span><span style=\"font-weight: 400;\"><br \/><\/span><span style=\"font-weight: 400;\">To ensure the safety of students and staff alike, Joseph Wiebel explains that he has devised and tested numerous solutions.  <\/span><\/p>\n<p>[\/et_pb_text][et_pb_image src=&#8221;https:\/\/adf-systemes.fr\/wp-content\/uploads\/2020\/07\/Capture-d\u2019e\u0301cran-2020-07-06-a\u0300-16.55.53.png&#8221; align=&#8221;center&#8221; _builder_version=&#8221;4.16&#8243; global_colors_info=&#8221;{}&#8221; theme_builder_area=&#8221;post_content&#8221;][\/et_pb_image][et_pb_text _builder_version=&#8221;4.24.0&#8243; hover_enabled=&#8221;0&#8243; global_colors_info=&#8221;{}&#8221; theme_builder_area=&#8221;post_content&#8221; sticky_enabled=&#8221;0&#8243;]<\/p>\n<h3 style=\"text-align: center;\"><strong>&#8220;It was impossible to run kilometers of cable to equip the buildings with new alarms. We considered using a vehicle equipped with loudspeakers and foghorns, but that was ineffective. So we pulled out all the stops.&#8221;<\/strong><\/h3>\n<p><strong><\/strong><\/p>\n<p><span style=\"font-weight: 400;\">Given the complexity of the project, with its many buildings, some of them semi-buried and separated by roads, it was financially impossible to envisage a traditional alarm system requiring the installation of kilometers of cable in each building.  <\/span><\/p>\n<p><span style=\"font-weight: 400;\">As conventional solutions were unsuitable, Isaac de l&#8217;\u00e9toile turned to ADF Syst\u00e8me for the purchase of a mast with 6 sirens to alert the population in 2017. This solution, identical to what can be found in our cities, enables centralized triggering from the establishment&#8217;s security station in the event of an intruder alert or major risk.   <\/span><\/p>\n<p><span style=\"font-weight: 400;\">The investment was substantial for the school, which received no government aid. It&#8217;s only in 2019 that Joseph Weibel decides to invest in another <a href=\"https:\/\/adf-systemes.fr\/en\/audible-and-visual-warning\/\">horn<\/a> to cover the school complex properly. <\/span><\/p>\n<p><span style=\"font-weight: 400;\">Installation is easily carried out in-house by two technicians and an IT specialist. ADF Syst\u00e8mes then comes in to check and start up the system. <\/span><\/p>\n<p><span style=\"font-weight: 400;\"><\/span><\/p>\n<h3 style=\"text-align: center;\"><strong>&#8220;ADF Syst\u00e8mes&#8217; offer was the one that best met our needs in terms of resources and power. It was the easiest to implement. &#8220;<\/strong><\/h3>\n<p><span style=\"font-weight: 400;\"><\/span><\/p>\n<p><span style=\"font-weight: 400;\">Joseph Weibel, who also manages 180 Catholic education properties in the Poitou-Charentes region, plans to apply this solution to other large structures.  <\/span><\/p>\n<p><span style=\"font-weight: 400;\"><\/span><\/p>\n<p><span style=\"font-weight: 400;\"><\/span><\/p>\n<h3 style=\"text-align: center;\"><strong>&#8220;Protecting students and staff is a major issue for a headteacher. Now I have a good warning system.&#8221;<\/strong><\/h3>\n<p><span style=\"font-weight: 400;\">Discover <\/span><a href=\"https:\/\/www.adf-systemes.fr\/nos-solutions\/\"><span style=\"font-weight: 400;\">warning solutions from ADF Syst\u00e8mes<\/span><\/a><span style=\"font-weight: 400;\"> to protect people in high-risk environments. Need advice?<\/span><a href=\"https:\/\/www.adf-systemes.fr\/contact\/\"><span style=\"font-weight: 400;\"> Contact our experts<\/span><\/a><span style=\"font-weight: 400;\"> today.<\/span><\/p>\n<p>[\/et_pb_text][et_pb_button button_url=&#8221;https:\/\/adf-systemes.fr\/en\/contact\/&#8221; button_text=&#8221;Let&apos;s talk about your project&#8221; button_alignment=&#8221;center&#8221; _builder_version=&#8221;4.16&#8243; custom_button=&#8221;on&#8221; button_bg_color=&#8221;#d7392e&#8221; button_border_width=&#8221;2px&#8221; button_border_color=&#8221;#d7392e&#8221; button_border_radius=&#8221;0px&#8221; background_layout=&#8221;dark&#8221; box_shadow_style=&#8221;preset1&#8243; global_colors_info=&#8221;{}&#8221; theme_builder_area=&#8221;post_content&#8221;][\/et_pb_button][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Isaac de l&#8217;Etoile school complex, spread over more than 14 hectares, called on ADF Syst\u00e8mes to install a population alert system meeting new safety standards (vigipirate, natural and technological risks) as part of its PPMS (Plan Particulier de Mise en S\u00e9curit\u00e9). Isaac de l&#8217;\u00e9toile, located in Poitiers&#8217; northern industrial zone, is an XXL school [&hellip;]<\/p>\n","protected":false},"author":59,"featured_media":15768404,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_et_pb_use_builder":"on","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[780],"tags":[],"dipi_cpt_category":[],"class_list":["post-15768401","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-case-studies"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>PPMS - Protecting people on school premises<\/title>\n<meta name=\"description\" content=\"As part of its PPMS (Plan Particulier de Mise en S\u00e9curit\u00e9), the Isaac de l&#039;\u00e9toile school complex, spread over more than 14 hectares, called on ADF Syst\u00e8mes to install a population alert system.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/adf-systemes.fr\/en\/the-ppms-for-isaac-de-letoile-ensuring-the-protection-of-people-on-a-large-scale-school-site\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"PPMS - Protecting people on school premises\" \/>\n<meta property=\"og:description\" content=\"As part of its PPMS (Plan Particulier de Mise en S\u00e9curit\u00e9), the Isaac de l&#039;\u00e9toile school complex, spread over more than 14 hectares, called on ADF Syst\u00e8mes to install a population alert system.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/adf-systemes.fr\/en\/the-ppms-for-isaac-de-letoile-ensuring-the-protection-of-people-on-a-large-scale-school-site\/\" \/>\n<meta property=\"og:site_name\" content=\"ADF Syst\u00e8mes\" \/>\n<meta property=\"article:published_time\" content=\"2020-07-06T15:05:14+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-01-15T14:49:29+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/adf-systemes.fr\/wp-content\/uploads\/2020\/07\/Capture-d\u2019e\u0301cran-2020-07-06-a\u0300-16.55.04.png\" \/>\n\t<meta property=\"og:image:width\" content=\"585\" \/>\n\t<meta property=\"og:image:height\" content=\"268\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Babacar Cisse\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Babacar Cisse\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/adf-systemes.fr\\\/en\\\/the-ppms-for-isaac-de-letoile-ensuring-the-protection-of-people-on-a-large-scale-school-site\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/adf-systemes.fr\\\/en\\\/the-ppms-for-isaac-de-letoile-ensuring-the-protection-of-people-on-a-large-scale-school-site\\\/\"},\"author\":{\"name\":\"Babacar Cisse\",\"@id\":\"https:\\\/\\\/adf-systemes.fr\\\/en\\\/#\\\/schema\\\/person\\\/49012254a7b3a3b3523d7fb11eae2a9d\"},\"headline\":\"The PPMS for Isaac de l&#8217;\u00e9toile: Ensuring the protection of people on a large-scale school site.\",\"datePublished\":\"2020-07-06T15:05:14+00:00\",\"dateModified\":\"2026-01-15T14:49:29+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/adf-systemes.fr\\\/en\\\/the-ppms-for-isaac-de-letoile-ensuring-the-protection-of-people-on-a-large-scale-school-site\\\/\"},\"wordCount\":889,\"image\":{\"@id\":\"https:\\\/\\\/adf-systemes.fr\\\/en\\\/the-ppms-for-isaac-de-letoile-ensuring-the-protection-of-people-on-a-large-scale-school-site\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/adf-systemes.fr\\\/wp-content\\\/uploads\\\/2020\\\/07\\\/Capture-d\u2019e\u0301cran-2020-07-06-a\u0300-16.55.04.png\",\"articleSection\":[\"Case studies\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/adf-systemes.fr\\\/en\\\/the-ppms-for-isaac-de-letoile-ensuring-the-protection-of-people-on-a-large-scale-school-site\\\/\",\"url\":\"https:\\\/\\\/adf-systemes.fr\\\/en\\\/the-ppms-for-isaac-de-letoile-ensuring-the-protection-of-people-on-a-large-scale-school-site\\\/\",\"name\":\"PPMS - Protecting people on school premises\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/adf-systemes.fr\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/adf-systemes.fr\\\/en\\\/the-ppms-for-isaac-de-letoile-ensuring-the-protection-of-people-on-a-large-scale-school-site\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/adf-systemes.fr\\\/en\\\/the-ppms-for-isaac-de-letoile-ensuring-the-protection-of-people-on-a-large-scale-school-site\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/adf-systemes.fr\\\/wp-content\\\/uploads\\\/2020\\\/07\\\/Capture-d\u2019e\u0301cran-2020-07-06-a\u0300-16.55.04.png\",\"datePublished\":\"2020-07-06T15:05:14+00:00\",\"dateModified\":\"2026-01-15T14:49:29+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/adf-systemes.fr\\\/en\\\/#\\\/schema\\\/person\\\/49012254a7b3a3b3523d7fb11eae2a9d\"},\"description\":\"As part of its PPMS (Plan Particulier de Mise en S\u00e9curit\u00e9), the Isaac de l'\u00e9toile school complex, spread over more than 14 hectares, called on ADF Syst\u00e8mes to install a population alert system.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/adf-systemes.fr\\\/en\\\/the-ppms-for-isaac-de-letoile-ensuring-the-protection-of-people-on-a-large-scale-school-site\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/adf-systemes.fr\\\/en\\\/the-ppms-for-isaac-de-letoile-ensuring-the-protection-of-people-on-a-large-scale-school-site\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/adf-systemes.fr\\\/en\\\/the-ppms-for-isaac-de-letoile-ensuring-the-protection-of-people-on-a-large-scale-school-site\\\/#primaryimage\",\"url\":\"https:\\\/\\\/adf-systemes.fr\\\/wp-content\\\/uploads\\\/2020\\\/07\\\/Capture-d\u2019e\u0301cran-2020-07-06-a\u0300-16.55.04.png\",\"contentUrl\":\"https:\\\/\\\/adf-systemes.fr\\\/wp-content\\\/uploads\\\/2020\\\/07\\\/Capture-d\u2019e\u0301cran-2020-07-06-a\u0300-16.55.04.png\",\"width\":585,\"height\":268,\"caption\":\"ppms\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/adf-systemes.fr\\\/en\\\/the-ppms-for-isaac-de-letoile-ensuring-the-protection-of-people-on-a-large-scale-school-site\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\\\/\\\/adf-systemes.fr\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"The PPMS for Isaac de l&#8217;\u00e9toile: Ensuring the protection of people on a large-scale school site.\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/adf-systemes.fr\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/adf-systemes.fr\\\/en\\\/\",\"name\":\"ADF Syst\u00e8mes\",\"description\":\"Le sp\u00e9cialiste des solutions de pr\u00e9vention des risques industriels et ATEX\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/adf-systemes.fr\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/adf-systemes.fr\\\/en\\\/#\\\/schema\\\/person\\\/49012254a7b3a3b3523d7fb11eae2a9d\",\"name\":\"Babacar Cisse\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b82bb023e87d3babd3256439c5b7bcc35afe5d6b9dc0c40d5ace87442c4e93c8?s=96&d=blank&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b82bb023e87d3babd3256439c5b7bcc35afe5d6b9dc0c40d5ace87442c4e93c8?s=96&d=blank&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b82bb023e87d3babd3256439c5b7bcc35afe5d6b9dc0c40d5ace87442c4e93c8?s=96&d=blank&r=g\",\"caption\":\"Babacar Cisse\"},\"url\":\"https:\\\/\\\/adf-systemes.fr\\\/en\\\/author\\\/b-cisse\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"PPMS - Protecting people on school premises","description":"As part of its PPMS (Plan Particulier de Mise en S\u00e9curit\u00e9), the Isaac de l'\u00e9toile school complex, spread over more than 14 hectares, called on ADF Syst\u00e8mes to install a population alert system.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/adf-systemes.fr\/en\/the-ppms-for-isaac-de-letoile-ensuring-the-protection-of-people-on-a-large-scale-school-site\/","og_locale":"en_US","og_type":"article","og_title":"PPMS - Protecting people on school premises","og_description":"As part of its PPMS (Plan Particulier de Mise en S\u00e9curit\u00e9), the Isaac de l'\u00e9toile school complex, spread over more than 14 hectares, called on ADF Syst\u00e8mes to install a population alert system.","og_url":"https:\/\/adf-systemes.fr\/en\/the-ppms-for-isaac-de-letoile-ensuring-the-protection-of-people-on-a-large-scale-school-site\/","og_site_name":"ADF Syst\u00e8mes","article_published_time":"2020-07-06T15:05:14+00:00","article_modified_time":"2026-01-15T14:49:29+00:00","og_image":[{"width":585,"height":268,"url":"https:\/\/adf-systemes.fr\/wp-content\/uploads\/2020\/07\/Capture-d\u2019e\u0301cran-2020-07-06-a\u0300-16.55.04.png","type":"image\/png"}],"author":"Babacar Cisse","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Babacar Cisse","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/adf-systemes.fr\/en\/the-ppms-for-isaac-de-letoile-ensuring-the-protection-of-people-on-a-large-scale-school-site\/#article","isPartOf":{"@id":"https:\/\/adf-systemes.fr\/en\/the-ppms-for-isaac-de-letoile-ensuring-the-protection-of-people-on-a-large-scale-school-site\/"},"author":{"name":"Babacar Cisse","@id":"https:\/\/adf-systemes.fr\/en\/#\/schema\/person\/49012254a7b3a3b3523d7fb11eae2a9d"},"headline":"The PPMS for Isaac de l&#8217;\u00e9toile: Ensuring the protection of people on a large-scale school site.","datePublished":"2020-07-06T15:05:14+00:00","dateModified":"2026-01-15T14:49:29+00:00","mainEntityOfPage":{"@id":"https:\/\/adf-systemes.fr\/en\/the-ppms-for-isaac-de-letoile-ensuring-the-protection-of-people-on-a-large-scale-school-site\/"},"wordCount":889,"image":{"@id":"https:\/\/adf-systemes.fr\/en\/the-ppms-for-isaac-de-letoile-ensuring-the-protection-of-people-on-a-large-scale-school-site\/#primaryimage"},"thumbnailUrl":"https:\/\/adf-systemes.fr\/wp-content\/uploads\/2020\/07\/Capture-d\u2019e\u0301cran-2020-07-06-a\u0300-16.55.04.png","articleSection":["Case studies"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/adf-systemes.fr\/en\/the-ppms-for-isaac-de-letoile-ensuring-the-protection-of-people-on-a-large-scale-school-site\/","url":"https:\/\/adf-systemes.fr\/en\/the-ppms-for-isaac-de-letoile-ensuring-the-protection-of-people-on-a-large-scale-school-site\/","name":"PPMS - Protecting people on school premises","isPartOf":{"@id":"https:\/\/adf-systemes.fr\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/adf-systemes.fr\/en\/the-ppms-for-isaac-de-letoile-ensuring-the-protection-of-people-on-a-large-scale-school-site\/#primaryimage"},"image":{"@id":"https:\/\/adf-systemes.fr\/en\/the-ppms-for-isaac-de-letoile-ensuring-the-protection-of-people-on-a-large-scale-school-site\/#primaryimage"},"thumbnailUrl":"https:\/\/adf-systemes.fr\/wp-content\/uploads\/2020\/07\/Capture-d\u2019e\u0301cran-2020-07-06-a\u0300-16.55.04.png","datePublished":"2020-07-06T15:05:14+00:00","dateModified":"2026-01-15T14:49:29+00:00","author":{"@id":"https:\/\/adf-systemes.fr\/en\/#\/schema\/person\/49012254a7b3a3b3523d7fb11eae2a9d"},"description":"As part of its PPMS (Plan Particulier de Mise en S\u00e9curit\u00e9), the Isaac de l'\u00e9toile school complex, spread over more than 14 hectares, called on ADF Syst\u00e8mes to install a population alert system.","breadcrumb":{"@id":"https:\/\/adf-systemes.fr\/en\/the-ppms-for-isaac-de-letoile-ensuring-the-protection-of-people-on-a-large-scale-school-site\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/adf-systemes.fr\/en\/the-ppms-for-isaac-de-letoile-ensuring-the-protection-of-people-on-a-large-scale-school-site\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/adf-systemes.fr\/en\/the-ppms-for-isaac-de-letoile-ensuring-the-protection-of-people-on-a-large-scale-school-site\/#primaryimage","url":"https:\/\/adf-systemes.fr\/wp-content\/uploads\/2020\/07\/Capture-d\u2019e\u0301cran-2020-07-06-a\u0300-16.55.04.png","contentUrl":"https:\/\/adf-systemes.fr\/wp-content\/uploads\/2020\/07\/Capture-d\u2019e\u0301cran-2020-07-06-a\u0300-16.55.04.png","width":585,"height":268,"caption":"ppms"},{"@type":"BreadcrumbList","@id":"https:\/\/adf-systemes.fr\/en\/the-ppms-for-isaac-de-letoile-ensuring-the-protection-of-people-on-a-large-scale-school-site\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/adf-systemes.fr\/en\/"},{"@type":"ListItem","position":2,"name":"The PPMS for Isaac de l&#8217;\u00e9toile: Ensuring the protection of people on a large-scale school site."}]},{"@type":"WebSite","@id":"https:\/\/adf-systemes.fr\/en\/#website","url":"https:\/\/adf-systemes.fr\/en\/","name":"ADF Syst\u00e8mes","description":"Le sp\u00e9cialiste des solutions de pr\u00e9vention des risques industriels et ATEX","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/adf-systemes.fr\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/adf-systemes.fr\/en\/#\/schema\/person\/49012254a7b3a3b3523d7fb11eae2a9d","name":"Babacar Cisse","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/b82bb023e87d3babd3256439c5b7bcc35afe5d6b9dc0c40d5ace87442c4e93c8?s=96&d=blank&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b82bb023e87d3babd3256439c5b7bcc35afe5d6b9dc0c40d5ace87442c4e93c8?s=96&d=blank&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b82bb023e87d3babd3256439c5b7bcc35afe5d6b9dc0c40d5ace87442c4e93c8?s=96&d=blank&r=g","caption":"Babacar Cisse"},"url":"https:\/\/adf-systemes.fr\/en\/author\/b-cisse\/"}]}},"jetpack_featured_media_url":"https:\/\/adf-systemes.fr\/wp-content\/uploads\/2020\/07\/Capture-d\u2019e\u0301cran-2020-07-06-a\u0300-16.55.04.png","_links":{"self":[{"href":"https:\/\/adf-systemes.fr\/en\/wp-json\/wp\/v2\/posts\/15768401","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/adf-systemes.fr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/adf-systemes.fr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/adf-systemes.fr\/en\/wp-json\/wp\/v2\/users\/59"}],"replies":[{"embeddable":true,"href":"https:\/\/adf-systemes.fr\/en\/wp-json\/wp\/v2\/comments?post=15768401"}],"version-history":[{"count":10,"href":"https:\/\/adf-systemes.fr\/en\/wp-json\/wp\/v2\/posts\/15768401\/revisions"}],"predecessor-version":[{"id":15768441,"href":"https:\/\/adf-systemes.fr\/en\/wp-json\/wp\/v2\/posts\/15768401\/revisions\/15768441"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/adf-systemes.fr\/en\/wp-json\/wp\/v2\/media\/15768404"}],"wp:attachment":[{"href":"https:\/\/adf-systemes.fr\/en\/wp-json\/wp\/v2\/media?parent=15768401"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/adf-systemes.fr\/en\/wp-json\/wp\/v2\/categories?post=15768401"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/adf-systemes.fr\/en\/wp-json\/wp\/v2\/tags?post=15768401"},{"taxonomy":"dipi_cpt_category","embeddable":true,"href":"https:\/\/adf-systemes.fr\/en\/wp-json\/wp\/v2\/dipi_cpt_category?post=15768401"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}